Project: Greg's_RV-10   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Greg Kochersperger   -  
Project:   Vans - RV-10
Total Hours:1320.9
Total Flight Time:1.1
Start/Last Date:Jan 15, 2021 - No Finish Date
Engine:IO-540
Propeller:TBD
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=Greg's_RV-10

Home or Last Project Picture

Mar 15, 2021     8-3: HS front spar attach brackets - FAIL - (1.5 hours)       Category: 8: Horiz Stab
Can't get anything else done on the rudder so thought I would skip ahead and fabricate some parts for the HS. The front spar attach brackets are cut from a pretty thick aluminum angle stock. One side is angled so I cut them on the band saw and then sanded the angle on the disc sander. They get pretty hot so I was actually stopping to throw them in the freezer occasionally.

I had the right one looking pretty good and while the left one was cooling I started to measure the holes to be drilled. Well, I figured out very quickly that I had cut them too short. They're clearly shown as 2 3/8” tall but I read 2” and cut them both.

No salvaging that. Ordered a new piece of stock from Van's. I could probably source it locally but for $6 I'll just get it from them. Probably $10 to ship though. My first completely ruined part. I guess I got off pretty cheap.

Purchases: Van's replacement HS attach brackets


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.